Filters
Question type

Study Flashcards

Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

Which gate in the RUP methodology expands on the agreed-upon details of the system, including the ability to provide an architecture to support and build it?


A) Inception
B) Elaboration
C) Construction
D) Transition

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

Time, cost, and ___________ are the three primary variables in any project.

Correct Answer

verifed

verified

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of these

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

What is project scope?


A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, or verifiable outcome, result or item that is produced to complete a project or part of a project
D) The work that must be completed to deliver a product with the specified features and functions

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

Explain the three different types of outsourcing along with their benefits and challenges.

Correct Answer

verifed

verified

Onshore outsourcing: engaging another co...

View Answer

Which of the following is an outsourcing challenge caused by contract length?


A) Difficulties in getting out of a contract
B) Problems in foreseeing future issues
C) Problems in reforming an internal IT department
D) All of these

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

Identify the three primary areas a project manager must focus on managing to ensure success.

Correct Answer

verifed

verified

The three primary areas a proj...

View Answer

Which of the following does a project manager perform?


A) Defines and develops the project plan
B) Tracks the plan to ensure all key project milestones are completed on time
C) Is an expert in project planning and management
D) All of these

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

Explain project management and the role the triple constraints play when managing a project.

Correct Answer

verifed

verified

A project is a temporary or short-term e...

View Answer

What is a business requirement?


A) The nonspecific business requests the system must meet to be successful
B) The specific business requests the system must meet to be successful
C) The nonspecific methodology the system must meet to be successful
D) The specific methodology the system must meet to be successful

E) None of the above
F) All of the above

Correct Answer

verifed

verified

____________ revenues are a business-related consequence of successful software.

Correct Answer

verifed

verified

What is an activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

In-sourcing is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

A) True
B) False

Correct Answer

verifed

verified

Showing 101 - 114 of 114

Related Exams

Show Answer